I’ll be doing Facebook Live sessions this entire week, going over common questions and frustrations for the ARE 5.0 exams. Today’s session, hosted on the RMSM Studio Facebook Page, focused on ways to fill in those construction detail gaps that exist in the references for the ARE 5.0 Construction & Evaluation exam.
Tune in tomorrow afternoon for the next Facebook Live Talk. If you’re not already follow me on Facebook and Instagram for all of my upcoming live sessions, sharing key study tips for the ARE exams.
Explaining the differences between the statute of repose and statute of limitations, with a free wallpaper download!
*This post has been corrected based off of helpful information from the ARE Facebook group.*
So in my ARE study group we were discussing the differences between these two concepts, and how confusing the many different references can be when trying to explain them. You can read several resources and watch many videos explaining the concept of statute of repose and statute of limitations, and that’s all fine and dandy, but what the actual limits when it comes to construction?
Here are some of the videos I checked out for reference:
Another helpful video by an actual architect, Werner Sabo:
These videos were helpful, but they didn’t give me the answer I was looking for. I thought it would be best to check the Architects Handbook, as it is definitely one of the main resources that NCARB is using to create these exams. *However, it does appear that the AHPP is wrong on this one.
What I found was, at its most basic level:
Statute of Repose is a claim based on negligence for design professionals or others, 3 to 10 years after substantial completion.
Statute of Limitations sets time limits under which claims can be made, commencing when the alleged digression is discovered, normally 10 years.
That’s it, that’s the difference. Each state has its own time limits, I had fun checking out mine, which seem pretty average (this list taught me to never sign a contract in Maine, lol.) There are also reasons why on average, statutes of repose are longer than statutes of limitations. To quote this article from Kevin Hara, referencing the Texas Supreme Court,
The whole point of layering a statute of repose over the statute of limitations is to fix an outer limit beyond which no action can be maintained. One practical upside of curbing open-ended exposure is to prevent defendants from answering claims where evidence may prove elusive due to unavailable witnesses (perhaps deceased), faded memories, lost or destroyed records, and institutions that no longer exist.
Methodist Healthcare Sys. of San Antonio v. Rankin, 307 S.W.3d 283, 286-87 (Tex. 2010 ) (internal citations and marks omitted)
To help me remember the difference between the two, I created a helpful wallpaper providing the differences in a simple way. You can get it for free at my Downloads page.
A live ARE 5.0 virtual study session on Instagram, in collaboration with @arch_exam_study
Collaboration time! If you’ve been following me on Instagram, you may have seen my recent #studywithme video (see below), which I got inspiration for from following @arch_exam_study.
With over a hundred views on the first day, we thought it would be a good idea to collaborate on a study session together. So we will be hosting an Instagram Live Study Session on September 1st, 2020. If you want to participate in our session, you can join by following me on Instagram at @rmsmstudio. I’ve also created a Facebook event for this live session, if you want to keep it in your Facebook calendar.
Study With Us! Instagram Live ARE 5.0 Study Session
Prerequisites: None! Just bring yourself and your current study materials and join in the session! Make sure to check out my study guides for PcM and PjM for material recommendations.
The format will be a quick intro, then silent study for an hour using the Pomodoro technique (25 minutes study, 5 minutes break). You can even follow along with your own Pomodoro timer if you want. I can answer any comments or questions during the 5-minute break. I will be studying for the CE exam, but you can feel free to join in and study for your current exam.
For an example of one of the previous #studywithme sessions, you can check out my 2-hour Late Night Pomodoro Study Session here.
For Construction Administration, I really recommend looking at as many real world documents as possible. Studying construction details? Check out your offices standard detail library. Studying certificates for payment? Find some examples online or see if you can look at any from a past project. There are also excellent videos on Youtube that go into how to fill out or create each of these documents or drawings, like this one below on the G702.
Question
Scorpion Commercial Group, along with their architect, Samsu Sola, has published an Advertisement for Bids in the Santa Fe Daily newspaper (see image below). They are advertising for open bidding a new commercial project located in Santa Fe, for a mixed use office building. Find at least 3 important pieces of information that are missing from the advertisement below:
Answer
The important information that is missing from this advertisement is:
Project Name and Location
Architect name and address
Project description including: type, size, construction materials and systems
Where bidding documents may be obtained or viewed
Amount of required bid deposit
Type and amount of bid bonds
Reference: Ballast: 49-3,4 Advertising for Bids
If you got all 6, well done! Let me know how many you got right in the comments. For more practice questions like this, feel free to check out the Practice Questions tab in the main menu. Also, don’t forget to sign up for my free PjM one page study guide, dropping on the 30th of August 2020. As always, happy studying!
So excited to announce that I passed my project management exam just last week. This is another great step forward in my ARE journey, and thank you for following me this far. I’m still getting over my post-exam jitters. I will be sharing my detailed study list and study methods in a few days, but in the meantime, please sign up for my one page ARE 5.0 PjM Study Guide, which I will be releasing for free on August 30th, 2020.
You can pre-order it now, and it will be delivered to your inbox on the release date. Keep your eyes peeled for my detailed study materials blog post, try out some of my PjM practice questions, and happy studying!
As I continue to study for ARE 5.0 Project Management, one of the areas I struggle with the most is Quality Management, but not for the reason you might think. For me, a lot of the concepts seem so obvious that it’s difficult for me to retain. So I’ll be reading it, agreeing with everything it says, but not retaining any specifics. So I’ve been trying to work on that in ways that will stay in my memory. Videos like the one below, and other tools are great visual aids to help me retain those details.
Practice Problem: Quality Management
Which of these items are not elements of a Quality Management (QM) in Construction Procurement?
Effective In-House Procurement Protocol
Beneficial Support Resources
Constant Monitoring and Documentation
Document Access and Control
Correct Answer
Document Access and Control is an Element of Quality Management in Construction Administration.
Wrong Answers
All of these items are Elements of Quality Management in Construction Procurement:
Effective In-House Procurement Protocol
Beneficial Support Resources
Constant Monitoring and Documentation
For reference for this question, check out AHPP Chapter 12.4.
Let me know how you did on this question, and make sure to follow RMSM Studios on Facebook and Instagram!
ARE 5.0 Project Management (PjM) Practice Question on firm utilization rates.
Utilization Rates are an important part of how firms track the hours spent on direct versus indirect labor, and are considered one of the 7 Key Financial Performance Indicators for architecture firms. I created this practice problem using the concept and real ways that it might change over time. Hyperfine is a great resource for practice questions and examples on both practice and project management concepts, as part of their Financial Formulas Workbook and their ARE 5.0 Courses.
Here’s a video of them going through a set of utilization rate questions.
Practice Question: Utilization Rates
The image below shows the salaries and utilization rates for the previous year for SKY Architects.
The salaries and utilization rates for this year are expected to be exactly the same, with the following changes:
Baboucar will be on paid paternity leave for 3 months
Yandeh will only be working part-time to pursue her graduate degree in historic presentation. Her utilization rate will be cut in half.
With these changes in mind, calculate the following:
Estimated annual direct labor budget
Yandeh R.’s estimated annual direct labor hours
Correct Answers
Question 01
In order to calculate the estimated annual budget we first need to calculate the direct labor budget for each member of staff:
Samuel: $170,000 * 0.5 = $85,000
Jeoffrey: $60,000 * 0 = $0
Yandeh: $90,500 salary, utilization rate = 0.8 * 0.5 = 0.4, so Yandeh’s direct salary this year will be $90,500 * 0.4 = $36,200
Fatou:$90,500 * 0.9 = $81,450
Baboucar: $70,000 salary, but he will only be working for 9 months out of 12, so we calculate 9/12 of his salary or 75%. So $70,000 * 0.75 = $52,500. With a consistent utilization rate of 0.9, his direct salary is $52,500 * 0.9 = $47,250
If we add up all of these direct salaries, we get $249,900.
Question 02
In order to calculate Yandeh’s estimated direct labor hours, we first need to determine hours per year. The number of hours in a year is 2080. Her current utilization rate is 80% but with her new graduate program, her utilization rate is reduced to 40% for this year.
So we would calculate 2080 hours * 0.4 = 832 direct labor hours this year.
Let me know how you did on this question, and make sure to follow RMSM Studios on Facebook and Instagram! Feel free to look through my blog for additional PjM Practice Questions and Mini Quizzes. You can search by tags, or by categories. If you have any questions, or you want to tell me how you did, leave a comment on the blog or on my Facebook page.
ARE 5.0 Practice question from RMSM Studio on the Americans with Disabilities Act (ADA, which is celebrating its 30 year anniversary!
Some of the links in this post are affiliate links. This means if you click on the link and purchase the item, I will receive an affiliate commission at no extra cost to you. All opinions remain my own.
Try your hand at this practice problem I created today based on the Americans with Disabilities Act (ADA), which had its 30th anniversary this week! Though this is something we study as a mandatory code to be enforced in architecture and the ARE specifically, it’s still important to remember the impact this legislation has on the lives of people everyday. You can also check out these great videos from Archicorner as a study reference for ADA design. Here’s a great video from them on the differences between ADA and Building Code Accessibility.
Here’s an additional great article from ArchDaily, which provides a simple guide to using ADA standards.
Practice Problem: ADA
The ADA prevents discrimination based on which of the following:
Discrimination based on gender, for employers with 15+ employees
Discrimination based on disability, regardless of employer size
Discrimination based on age, for employers with 20+ employees
Discrimination based on disbility, for employers with 15+ employees
Correct Answer
Discrimination based on disability, for employers with 15+ employees.
Wrong Answers
The Civil Right Act, Title VII prevents discrimination based on gender, race color, religion, national origin and sexual orientation for employers with 15+ employees.
ADA prevents discrimination based on disability specifically for employers with 15+ employees.
ADEA (Age Discrimination in Employment Act) prevents discrimination based on age.
Let me know how you did on this question, and make sure to follow RMSM Studios on Facebook and Instagram! For more practice questions you can check out my mini quizzes, or some of the awesome practice exams created by Designer Hacks (which I just used today, got a 77% lol) and the Walking the ARE Practice Exams. As always, happy studying!
Mini Quiz from RMSM Studio on the Project Planning and Management
I’ve created these questions based on the Ballast Review Manual, which you can find for on Amazon, or search for a used version in the ARE Facebook Group. The Ballast Review Manual comes very highly recommended for multiple ARE exams, and you can check out the Young Architect website for a 15% off discount from PPI2Pass.
Question 01
Within the Critical Path Method (CPM), which items are denoted by a solid arrow?
Dummies
Tasks
The Critical Path
Dependencies
Question 02
Which elements form part of the project work plan? (Select all that apply)
Allocation of time and fees
Staff Required
Instruments of service
Milestones
Contingencies
Consultant work and fees
Question 03
Architects should consider the follow issues when assembling a project team, except for: (Select one)
Billing Rates
Project Size and Complexity
Personalities
Contractor Experience
Question 04
What is the typical fee percentage for Design Development?
15%
20%
30%
40%
Question 01
Within the Critical Path Method (CPM), which items are denoted by a solid arrow?
Tasks
Dummies are represented by dashed arrows, as opposed to the heavy dashed arrows which show the Critical Path. Dummies are another name for Dependencies.
Ballast, page 4-6
Question 02
Which elements form part of the project work plan? (Select all that apply)
Allocation of time and fees
Staff Required
Milestones
Consultant work and fees
Though the project can be broken down into phases and individual tasks, the instruments of service themselves are not an element of the project work plan.
Although time and fees allocated to the project can both include contingencies, contingencies themselves are not an element of the project work plan.
Ballast, page 4-8
Question 03
Architects should consider the follow issues when assembling a project team, except for: (Select one)
Contractor Experience
Architects do not make the selection for contractors, though contractors can be a part of the overall project team.
Ballast, page 4-4
Question 04
What is the typical fee percentage for Design Development?
20%
On a typical design-bid-build project, the fee percentages are as follows:
Schematic Design: 15%
Design Development: 20%
Construction Documentation: 40%
Bidding: 5%
Contract Administration: 20%
Ballast, page 4-9
I hope you like this mini quiz. Let me know how you did in the comments, or on the RMSM Studio Facebook page. If you got none of them right, it’s time to hit the books!
If you’re studying for Project Management, feel free to check out my other Mini Quiz on the A201, and if you’re studying for Construction & Evaluation, check out my Mini Quiz on C401.
A 4 question quiz on the General Conditions of the Contract for Construction. The answers are provided after the questions. The A201 contract is available as a free download from the AIA website, and I’m currently studying it in preparation for my upcoming Project Management (PjM) and Construction & Evaluation (CE) Exam. It is listed within the ARE 5.0 Reference Matrix as a study material for PjM. Good luck studying, and if you have any questions, let me know in the comments!
Question 01
When does the Owner not have to share information about their financial arrangements for the Work?
Prior to the commencement of the work
When the Owner fails to make payments as per the contract documents
When a change in the work materially changes the contract sum
When the Architect issues a Certificate for Payment
Question 02
A Modification is all of the following, except for a: (Choose 1)
Construction Change Directive
Written Order for a minor change in work issued by the Owner
Change Order
Written Amendment to the Contract signed by both parties
Question 03
The Contractor shall immediately suspend any operations if they encounter the following conditions, except for:
(Choose 1)
Wetlands
Archaeological Sites
Burial Markers
Contract Documents in violation of applicable laws
Question 04
Select all items provided and paid for by the Contractor:
Sales Tax
Approvals for Occupancy
Temporary facilities not incorporated in the work
Utilities
Equipment and Machinery
Transportation
Question 01
When does the Owner not have to share information about their financial arrangements for the Work?
Correct Answers
When the Architect issues a Certificate for Payment
Incorrect Answers
Prior to the commencement of the work – Article 2.2.1 Prior to commencement of work and upon written request of the contractor, the owner shall furnish to the contractor evidence that the owner has made financial arrangements
When the Owner fails to make payments as per the contract documents & When a change in the work materially changes the contract sum – See Article 2.2.2
Question 02
A Modification is all of the following, except for a: (Choose 1)
Correct Answer
Written Order for a minor change in work issued by the Owner – Owners do not issue minor changes in work, those are issue by the Architect
Incorrect Answers
Construction Change Directive, Change Order, and a Written Amendment to the Contract signed by both parties: are all listed under Article 1.1.1 as Modifications.
Question 03
The Contractor shall immediately suspend any operations if they encounter the following conditions, except for:
Correct Answer
contract documents in violation of applicable laws – Article 3.2.3 The Contractor is not required to suspend work upon discovery of a nonconformity of the Contract Documents, only required to promptly report to the Architect
Incorrect Answers
According to Article 3.7.5 if the COntractor discovers any of these conditions, they shall immediately suspend operations:
Wetlands
Archaeological sites
Burial markers
Question 04
Select all items provided and paid for by the Contractor:
Correct Answer
Sales Tax – Article 3.6 Taxes
Temporary facilities not incorporated in the work – Article 3.4.1
Utilities – Article 3.4.1
Equipment and Machinery – Article 3.4.1
Transportation – Article 3.4.1
Incorrect Answers
All other items are to be provided by the Contractor.
Approvals for Occupancy – Provided by the owner as per Article 2.3.1
Thanks for taking part in my quiz, let me know how you did in the comments! You can also check out my mini quiz for C401 or check out my reviews for other practice exam providers.