Mini Quiz: HVAC System Selection

The seconds are ticking down for my first attempt at PDD. I’m currently going through HVAC systems with my ARE Study Group (hi guys!) and I said I would come up with some questions on HVAC selection for different building types. I used the Architect’s Studio Companion to put these questions together.

Question 01

Brad Pitt is currently searching for a small two bedroom bungalow in a climate where the main heat loss is through the building skin in the winter. He is a big advocate for going green and wants a system that is sustainable. What system should he select to heat the building?

Question 02

The Tavares Continental Hotel Suites wants a new HVAC unit to service their kitchen and laundry spaces in an existing hotel that they are renovating. This system should provide heating and cooling, and plenty of fresh air. They want an enclosed system that can utilize the overheated areas to heat the underheated areas of the hotel. Cost is not a primary concern. Which system should the hotelier go for?

Question 03

Torrential Inc. is looking to expand their research campus with a new laboratory. They are looking for an HVAC system which provides heating and cooling, with good humidity control and efficiency. They would prefer a quiet system that won’t interfere with their research work, with a reduced risk of mold which could contaminate their samples, and can provide them with lower ceiling to floor heights. To save on energy costs this system will be tied into a geothermal exchange. What system should they choose?

Question 04

You have been engaged by a developer, the Yu Chen & Associates Construction Group, to provide a design for a hotel. The system needs to have low intial costs, with no central equipment, piping or ductwork. Due to the nature of the building operations, they would prefer to have lower operating costs as well. Which HVAC system should the architect select?

Question 05

The American University Washington would like to create a new 6 story Economics Building dedicated to one of their alumni, Ms. Manisha Singh, the current Assistant Secretary, Economic & Business Affairs in the U.S. Department of State. American University has stressed the need for a quite system, so as not to interfere with the lectures. The university has requested that system provide a low first cost with low maintenance requirements to provide room in their budget for higher quality finishes. What HVAC system would you recommend?

Correct Answers

For all answers, reference the Architect’s Studio Companion sections on HVAC selection. This is one of my favorite books on this topic, as it deals with system selection in a very straightforward way.

  1. Passive Solar Heating, refer to page 228
  2. Closed Loop Heat Pump System, refer to page 181
  3. Active Chilled Beam System, refer to page 178
  4. Packaged Terminal Unit Systems, refer to page 184
  5. Variable Air Ventilation System, page 174

Let me know how you did on this question, or share your alternative answers in the ARE Studio Facebook Group, and make sure to follow RMSM Studios on Facebook and Instagram!

Practice Question: Invitation to Bid

For Construction Administration, I really recommend looking at as many real world documents as possible. Studying construction details? Check out your offices standard detail library. Studying certificates for payment? Find some examples online or see if you can look at any from a past project. There are also excellent videos on Youtube that go into how to fill out or create each of these documents or drawings, like this one below on the G702.

Question

Scorpion Commercial Group, along with their architect, Samsu Sola, has published an Advertisement for Bids in the Santa Fe Daily newspaper (see image below). They are advertising for open bidding a new commercial project located in Santa Fe, for a mixed use office building. Find at least 3 important pieces of information that are missing from the advertisement below:

Answer

The important information that is missing from this advertisement is:

  • Project Name and Location
  • Architect name and address
  • Project description including: type, size, construction materials and systems
  • Where bidding documents may be obtained or viewed
  • Amount of required bid deposit
  • Type and amount of bid bonds

Reference: Ballast: 49-3,4 Advertising for Bids

If you got all 6, well done! Let me know how many you got right in the comments. For more practice questions like this, feel free to check out the Practice Questions tab in the main menu. Also, don’t forget to sign up for my free PjM one page study guide, dropping on the 30th of August 2020. As always, happy studying!

Mini Quiz: CM Project Delivery Methods

Mini Quiz from RMSM Studio on Construction Manager Project Delivery Methods

I haven’t had any experience in the past with working with Construction Managers, so I feel like I really had to go the extra mile to understand all the differences and roles & responsibilities in the different CM project delivery methods. I’ve created some very handy charts to help explain the differences between CMa and CMc, I may release it later when I’m less overwhelmed.

I’m also trying to get back into the habit of regular note taking instead of being so focused on watching the explanatory videos. I was really inspired by this video I watched today by Jorge Herrera on quick study tips. I’ll probably be buying an assortment of notebooks and binders for my path forward, and take advantage of some of these back to school sales.

Question 01

Joanne Bowman is the manager of a government branch looking to expand in the near future. She is looking for a high-quality design, with low risk. Which project delivery methods would you, as her architect, recommend to her? (Select two)

  • Design-Bid-Build
  • Construction Manager as Advisor
  • Construction Manager as Constructor
  • Integrated Project Delivery

Question 02

While on the construction site, the Project Architect Maryam Lanoir notices a defect in the work. Since this project is a Construction Manager as Advisor project delivery method, what should be her next steps?

  • Instruct the superintendent to correct the deficiency, as per the contract drawings
  • Notify the Owner
  • Notify the Contractor
  • Notify the Construction manager
  • All of the above

Question 03

Jessica Trevi is an architect providing construction administration services on a Construction Manager as Advisor project. What is not a joint service that she provides?

  • Certifying applications for payment
  • Preparing change orders
  • Reviewing RFIs
  • Rejecting work

Question 01

CORRECT ANSWERS

  • Construction Manager as Constructor
  • Integrated Project Delivery

Both CMc and IPD are preferred in projects with high building quality standards, and where owners want to reduce their risk.

inCORRECT ANSWERS

Construction Manager as Adviser is a preferred choice for reducing project risk, but it is not always used for high building quality. Design-bid-build, is known for being low cost, which also can create low quality, as well as being high risk.

For reference, read Ballast Chapter 3.

Question 02

While on the construction site, the Project Architect Maryam Lanoir notices a defect in the work. Since this project is a Construction Manager as Advisor project delivery method, what should be her next steps?

  • Notify the Owner
  • Notify the Contractor
  • Notify the Construction Manager

With CMa projects, it is the architect’s responsibility to notify the Owner and the Construction Manager of any observed defects and deficiencies. See A232 – Article 4.2.2

The architect is not able to issue instructions to the superintendent. According to A232 – Article 3.9.1, it is only communications, not instructions that can be given to the superintendent.

Question 03

Jessica Trevi is an architect providing construction administration services on a Construction Manager as Advisor project. What is not a joint service that she provides?

Preparing change orders

CORRECT ANSWER

Preparing change orders or construction change directives is not a joint service provided the architect in construction administration.

Certifying applications for payment, RFI review and rejecting work is something that is done by both the CM and architect in a CMa project delivery.


I hope you like this mini quiz. Let me know how you did in the comments, or on the RMSM Studio Facebook page.

All of my recent practice questions are now available in one place, on the Practice Questions page in the top menu.

If you want to find other great practice tests, you can also have a look at my One Minute Reviews, where I give my feedback on ARE study materials in under a minute.

Mini Quiz: Risk Management

Mini Quiz from RMSM Studio on the Management of Risk For Architects

Risk Management is one of the key concepts in all stages of design. This is because whenever you are creating a building, you must always assume some risk. This is an essential concept for both Practice Management and Project Management. In the Wiley AHPP Guide for the Project Management (PjM) Exam, under the Risk Management chapter, they just say “All”. It’s that important. I hope you enjoy this mini quiz and as always, let me know how you did in the comments.

Question 01

Which types of firms will some underwriters have hesitation insuring?

  • Those with low deductibles
  • Those that don’t provide construction administration services
  • Those with a high number of inexperienced employees
  • Those using the AIA contract document suite

Question 02

Jay York, Esq. is an attorney who has been hired by Jasmine Board Architects. They have been hired to review their proposed insurance policies. Which of the following policy’s should Jay mark for further review with Jasmine Board Architects?

  • Indemnification for those not party to the Agreement
  • Client indemnity to architect for misuse of the architect’s drawings
  • Defending the Owner against third-party claims
  • Mutual indemnities between architects and consultants
  • All of the above

Question 03

Select all problematic words from the advertisement below created by Diedre Lock Associates:


Question 01

Those that don’t provide construction administration services

There is a high number of claims that arise when an architect only provides pre-construction services, as they are not there to defend themselves or their drawings.

Incorrect Answers

  • Those with low deductibles – Deductibles with another insurer would not affect another company’s coverage.
  • Those with a high number of inexperienced employees – As long as there are staff available that are qualified to complete the projects on hand, the number of inexperienced employees is irrelevant.
  • Those using the AIA contract document suite – Using a the standard AIA contract documents means that an insurer specializing in construction would be more likely to insure you, due to the industry’s familiarity with them.

Question 02

Policies that should be reviewed, due to being unmanageable risks, are:

  • Indemnification for those not party to the Agreement
  • Client indemnity to architect for misuse of the architect’s drawings
  • Defending the Owner against third-party claims

Incorrect Answers

Mutual indemnities between architects and consultants is actually a beneficial policy for an architect’s agreement. Study B101 8.4 for a good model of policies.

Question 03

The problematic words in this advertisement were:

  • Ensure
  • Best
  • 100% Completion
  • All
  • Assured
  • Thorough
  • Best
  • Guaranteed

I hope you like this mini quiz. Let me know how you did in the comments, or on the RMSM Studio Facebook page.

If you’re studying for Practice Management, feel free to check out my other Mini Quiz on the AIA A201 Document and my post on passing the PcM Exam. I have also created a one-page study guide based on the methods I used to pass PcM on the first try.

If you’re studying for Construction & Evaluation or Project Management, check out my Mini Quiz on the AIA C401 Contract.

All of my recent practice questions are also available for you to scroll through below, or on the specific page I’ve created for them at the top of the website:

If you want to find other great practice tests, you can also have a look at my One Minute Reviews, where I give my feedback on ARE study materials in under a minute.

Practice Question: Quality Management

As I continue to study for ARE 5.0 Project Management, one of the areas I struggle with the most is Quality Management, but not for the reason you might think. For me, a lot of the concepts seem so obvious that it’s difficult for me to retain. So I’ll be reading it, agreeing with everything it says, but not retaining any specifics. So I’ve been trying to work on that in ways that will stay in my memory. Videos like the one below, and other tools are great visual aids to help me retain those details.

Practice Problem: Quality Management

Which of these items are not elements of a Quality Management (QM) in Construction Procurement?

  • Effective In-House Procurement Protocol
  • Beneficial Support Resources
  • Constant Monitoring and Documentation
  • Document Access and Control

Correct Answer

Document Access and Control is an Element of Quality Management in Construction Administration.

Wrong Answers

All of these items are Elements of Quality Management in Construction Procurement:

  • Effective In-House Procurement Protocol
  • Beneficial Support Resources
  • Constant Monitoring and Documentation

For reference for this question, check out AHPP Chapter 12.4.


Let me know how you did on this question, and make sure to follow RMSM Studios on Facebook and Instagram!

Practice Question: Utilization Rates

ARE 5.0 Project Management (PjM) Practice Question on firm utilization rates.

Utilization Rates are an important part of how firms track the hours spent on direct versus indirect labor, and are considered one of the 7 Key Financial Performance Indicators for architecture firms. I created this practice problem using the concept and real ways that it might change over time. Hyperfine is a great resource for practice questions and examples on both practice and project management concepts, as part of their Financial Formulas Workbook and their ARE 5.0 Courses.

Here’s a video of them going through a set of utilization rate questions.

Practice Question: Utilization Rates

The image below shows the salaries and utilization rates for the previous year for SKY Architects.

The salaries and utilization rates for this year are expected to be exactly the same, with the following changes:

  • Baboucar will be on paid paternity leave for 3 months
  • Yandeh will only be working part-time to pursue her graduate degree in historic presentation. Her utilization rate will be cut in half.

With these changes in mind, calculate the following:

  1. Estimated annual direct labor budget
  2. Yandeh R.’s estimated annual direct labor hours

Correct Answers

Question 01

In order to calculate the estimated annual budget we first need to calculate the direct labor budget for each member of staff:

  • Samuel: $170,000 * 0.5 = $85,000
  • Jeoffrey: $60,000 * 0 = $0
  • Yandeh: $90,500 salary, utilization rate = 0.8 * 0.5 = 0.4, so Yandeh’s direct salary this year will be $90,500 * 0.4 = $36,200
  • Fatou:$90,500 * 0.9 = $81,450
  • Baboucar: $70,000 salary, but he will only be working for 9 months out of 12, so we calculate 9/12 of his salary or 75%. So $70,000 * 0.75 = $52,500. With a consistent utilization rate of 0.9, his direct salary is $52,500 * 0.9 = $47,250

If we add up all of these direct salaries, we get $249,900.

Question 02

In order to calculate Yandeh’s estimated direct labor hours, we first need to determine hours per year. The number of hours in a year is 2080. Her current utilization rate is 80% but with her new graduate program, her utilization rate is reduced to 40% for this year.

So we would calculate 2080 hours * 0.4 = 832 direct labor hours this year.


Let me know how you did on this question, and make sure to follow RMSM Studios on Facebook and Instagram! Feel free to look through my blog for additional PjM Practice Questions and Mini Quizzes. You can search by tags, or by categories. If you have any questions, or you want to tell me how you did, leave a comment on the blog or on my Facebook page.

Practice Question: ADA

ARE 5.0 Practice question from RMSM Studio on the Americans with Disabilities Act (ADA, which is celebrating its 30 year anniversary!

Some of the links in this post are affiliate links. This means if you click on the link and purchase the item, I will receive an affiliate commission at no extra cost to you. All opinions remain my own.

Try your hand at this practice problem I created today based on the Americans with Disabilities Act (ADA), which had its 30th anniversary this week! Though this is something we study as a mandatory code to be enforced in architecture and the ARE specifically, it’s still important to remember the impact this legislation has on the lives of people everyday. You can also check out these great videos from Archicorner as a study reference for ADA design. Here’s a great video from them on the differences between ADA and Building Code Accessibility.

Here’s an additional great article from ArchDaily, which provides a simple guide to using ADA standards.

Practice Problem: ADA

The ADA prevents discrimination based on which of the following:

  • Discrimination based on gender, for employers with 15+ employees
  • Discrimination based on disability, regardless of employer size
  • Discrimination based on age, for employers with 20+ employees
  • Discrimination based on disbility, for employers with 15+ employees

ARE 5.0 Practice question from RMSM Studio on the Americans with Disabilities Act (ADA, which is celebrating its 30 year anniversary!

Correct Answer

Discrimination based on disability, for employers with 15+ employees.

Wrong Answers

The Civil Right Act, Title VII prevents discrimination based on gender, race color, religion, national origin and sexual orientation for employers with 15+ employees.

ADA prevents discrimination based on disability specifically for employers with 15+ employees.

ADEA (Age Discrimination in Employment Act) prevents discrimination based on age.


Let me know how you did on this question, and make sure to follow RMSM Studios on Facebook and Instagram! For more practice questions you can check out my mini quizzes, or some of the awesome practice exams created by Designer Hacks (which I just used today, got a 77% lol) and the Walking the ARE Practice Exams. As always, happy studying!

Mini Quiz: Project Management

Mini Quiz from RMSM Studio on the Project Planning and Management

I’ve created these questions based on the Ballast Review Manual, which you can find for on Amazon, or search for a used version in the ARE Facebook Group. The Ballast Review Manual comes very highly recommended for multiple ARE exams, and you can check out the Young Architect website for a 15% off discount from PPI2Pass.

Question 01

Within the Critical Path Method (CPM), which items are denoted by a solid arrow?

  • Dummies
  • Tasks
  • The Critical Path
  • Dependencies

Question 02

Which elements form part of the project work plan? (Select all that apply)

  • Allocation of time and fees
  • Staff Required
  • Instruments of service
  • Milestones
  • Contingencies
  • Consultant work and fees

Question 03

Architects should consider the follow issues when assembling a project team, except for: (Select one)

  • Billing Rates
  • Project Size and Complexity
  • Personalities
  • Contractor Experience

Question 04

What is the typical fee percentage for Design Development?

  • 15%
  • 20%
  • 30%
  • 40%

Question 01

Within the Critical Path Method (CPM), which items are denoted by a solid arrow?

  • Tasks

Dummies are represented by dashed arrows, as opposed to the heavy dashed arrows which show the Critical Path. Dummies are another name for Dependencies.

Ballast, page 4-6

Question 02

Which elements form part of the project work plan? (Select all that apply)

  • Allocation of time and fees
  • Staff Required
  • Milestones
  • Consultant work and fees

Though the project can be broken down into phases and individual tasks, the instruments of service themselves are not an element of the project work plan.

Although time and fees allocated to the project can both include contingencies, contingencies themselves are not an element of the project work plan.

Ballast, page 4-8

Question 03

Architects should consider the follow issues when assembling a project team, except for: (Select one)

  • Contractor Experience

Architects do not make the selection for contractors, though contractors can be a part of the overall project team.

Ballast, page 4-4

Question 04

What is the typical fee percentage for Design Development?

  • 20%

On a typical design-bid-build project, the fee percentages are as follows:

Schematic Design: 15%

Design Development: 20%

Construction Documentation: 40%

Bidding: 5%

Contract Administration: 20%

Ballast, page 4-9


I hope you like this mini quiz. Let me know how you did in the comments, or on the RMSM Studio Facebook page. If you got none of them right, it’s time to hit the books!

If you’re studying for Project Management, feel free to check out my other Mini Quiz on the A201, and if you’re studying for Construction & Evaluation, check out my Mini Quiz on C401.

If you want to find other great practice tests, you can also have a look at my One Minute Reviews, where I give my feedback on ARE study materials in under a minute.

Mini Quiz: AIA Code of Ethics and Professional Conduct

Mini Quiz from RMSM Studio on the AIA Code of Ethics and Professional COnduct 2018

I’ve created these questions based on the 2018 AIA Code of Ethics and Professional Conduct, which you can find for free here. This is a very short, easy to read document, but very important to professional practice.

Question 01

Which Ethical Standards fall under Canon VI: Obligations to the Environment?

  • Alternative energy sources
  • Building materials
  • Indoor Air Quality
  • None of the Above

Question 02

Penalties imposed by the National Ethics Council include: (Select all that apply)

  • Censure, with appeal
  • Admonition, with appeal
  • Litigation, with appeal
  • Suspension of membership, with appeal
  • Termination of membership, without appeal

Question 03

An architect wants to file a claim against another architect using Rule 4.101 of the Code of Ethics. What actions must they take?

  • Consult their legal counsel
  • Ensure proof of violation of one other rule
  • Consult their insurance company
  • Ensure proof of fraud based on an independent finding of a violation of the law

Question 04

What Canon does this statement fall within:

Members shall continually seek to raise the standards of aesthetic excellence, architectural education, research, training, and practice.

  • Canon II: Obligations to the Public
  • Canon I: General Obligations
  • Canon V: Obligations to Colleagues
  • Canon IV: Obligations to the Profession

Question 01

Which Ethical Standard fall under Canon VI: Obligations to the Environment?

  • Building materials

All other answers are not ethical standards under Canon VI: Obligations to the Environment.

Question 02

Penalties imposed by the National Ethics Council include: (Select all that apply)

  • Censure, with appeal
  • Admonition, with appeal
  • Suspension of membership, with appeal

Litigation is not a penalty imposed by the Natinoal Ethics Council. All penalties allow for appeal procedures, so “Termination of membership, without appeal” is incorrect.

Question 03

An architect wants to file a claim against another architect using Rule 4.101 of the Code of Ethics. What actions must they take?

  • Ensure proof of violation of one other rule

Under Canon IV: Obligations to the Profession: “Enforcement of Rule 4.101 refers to and supports enforcement of other Rules. A violation of Rule 4.101 cannot be established without proof of a pertinent violation of at least one other Rule.”

Question 04

What Canon does this statement fall within:

Members shall continually seek to raise the standards of aesthetic excellence, architectural education, research, training, and practice.

  • Canon I: General Obligations

I hope you like this mini quiz. Let me know how you did in the comments, or on the RMSM Studio Facebook page. If you’re studying for Practice Management, feel free to check out my other Mini Quiz on the A201 and my post on passing the PcM Exam, and if you’re studying for Construction & Evaluation, check out my Mini Quiz on C401.

If you want to find other great practice tests, you can also have a look at my One Minute Reviews, where I give my feedback on ARE study materials in under a minute.

Mini Quiz: A201

A 4 question quiz on the General Conditions of the Contract for Construction. The answers are provided after the questions. The A201 contract is available as a free download from the AIA website, and I’m currently studying it in preparation for my upcoming Project Management (PjM) and Construction & Evaluation (CE) Exam. It is listed within the ARE 5.0 Reference Matrix as a study material for PjM. Good luck studying, and if you have any questions, let me know in the comments!

Question 01

When does the Owner not have to share information about their financial arrangements for the Work?

  • Prior to the commencement of the work
  • When the Owner fails to make payments as per the contract documents
  • When a change in the work materially changes the contract sum
  • When the Architect issues a Certificate for Payment

Question 02

A Modification is all of the following, except for a: (Choose 1)

  • Construction Change Directive
  • Written Order for a minor change in work issued by the Owner
  • Change Order
  • Written Amendment to the Contract signed by both parties

Question 03

The Contractor shall immediately suspend any operations if they encounter the following conditions, except for:

(Choose 1)

  • Wetlands
  • Archaeological Sites
  • Burial Markers
  • Contract Documents in violation of applicable laws

Question 04

Select all items provided and paid for by the Contractor:

  • Sales Tax
  • Approvals for Occupancy
  • Temporary facilities not incorporated in the work
  • Utilities
  • Equipment and Machinery
  • Transportation

Question 01

When does the Owner not have to share information about their financial arrangements for the Work?

Correct Answers

  • When the Architect issues a Certificate for Payment

Incorrect Answers

Prior to the commencement of the work – Article 2.2.1 Prior to commencement of work and upon written request of the contractor, the owner shall furnish to the contractor evidence that the owner has made financial arrangements

When the Owner fails to make payments as per the contract documents & When a change in the work materially changes the contract sum – See Article 2.2.2

Question 02

A Modification is all of the following, except for a: (Choose 1)

Correct Answer

  • Written Order for a minor change in work issued by the Owner – Owners do not issue minor changes in work, those are issue by the Architect

Incorrect Answers

Construction Change Directive, Change Order, and a Written Amendment to the Contract signed by both parties: are all listed under Article 1.1.1 as Modifications.

Question 03

The Contractor shall immediately suspend any operations if they encounter the following conditions, except for:

Correct Answer

  • contract documents in violation of applicable laws – Article 3.2.3 The Contractor is not required to suspend work upon discovery of a nonconformity of the Contract Documents, only required to promptly report to the Architect

Incorrect Answers

According to Article 3.7.5 if the COntractor discovers any of these conditions, they shall immediately suspend operations:

  • Wetlands
  • Archaeological sites
  • Burial markers

Question 04

Select all items provided and paid for by the Contractor:

Correct Answer

  • Sales Tax – Article 3.6 Taxes
  • Temporary facilities not incorporated in the work – Article 3.4.1
  • Utilities – Article 3.4.1
  • Equipment and Machinery – Article 3.4.1
  • Transportation – Article 3.4.1

Incorrect Answers

All other items are to be provided by the Contractor.

  • Approvals for Occupancy – Provided by the owner as per Article 2.3.1

Thanks for taking part in my quiz, let me know how you did in the comments! You can also check out my mini quiz for C401 or check out my reviews for other practice exam providers.